690 Colusa Avenue, Berkeley, CA 94707
Chronology of Home Improvements
New forced air furnace – 2003
New gas range – 2003
New dishwasher – 2003
New washer and dryer – 2003
New electrical wiring and breaker box - 2003
All wooden floors, 1st and 2nd floor refinished – 2003
New chandelier, dining room – 2003
New chandelier, Colusa entrance – 2003
New chandelier, front hallway – 2003
New sconces with dimmers in front room – 2003
Earthquake retrofitting throughout basement - 2004
RECO Certification – August, 2004
Garbage disposal installed in kitchen sink – 2005
Track lighting with dimmers in kitchen – 2005
Sue Johnson lighting shades added in master bedroom, 2nd floor hallway, 1/2 bath
Upper walls of front hallway re-plastered and painted – 2006
Front hallway re-plastered and repainted - 2006
Refinished woodwork in front hall and stairway – 2006, 2007
New kitchen sink hardware - 2006
Master bedroom painted - 2007
Walls of stairwell replastered and painted – 2007
Second floor hallway repainted – 2007
Ceiling of second floor hallway resurfaced and painted - 2007
New dining room doors with double pane glass - 2007
New master bedroom double pane windows on Portland side - 2007
3 new front room bay double pane windows - 2007
New door leading to roof upstairs with double pane glass – 2007
Dining Room woodwork refinished – 2008
Dining Room painted - 2008
New hot water heater – 2008
New “telephone” faucet for clawfoot tub in master bath - 2008
New recessed canister lights above kitchen sink – 2009
New hardware on Portland side door – July, 2009
New sink - 1/2 bath downstairs – July, 2009
New floor – 1/2 bath downstairs – July, 2009
Newly painted kitchen and laundry room – July, 2009
Stripped and refinished original fir kitchen floor – July, 2009
Trees trimmed – July, 2009
Second bedroom painted – July, 2009
Lighting fixture in second bedroom replaced – July, 2009
Newly painted car port – July 2009
Outdoor plant additions – 2004 – 2009
Handicapped zone removed by the city – July 2009
Sidewalks around house patched by the city – July 2009
Completely painted master bedroom bathroom, including floor – August, 2009
New stepping stone pathway added to side yard – August 2009
All trim on house painted – August/September 2009
Completely sealed concrete patio – September 2009
Replaced rain-damaged ledger boards in sub-patio area with pressure treated wood – September 2009
Additional shear wall work done to augment existing earthquake retrofitting – September 2009
Replaced and braced drainage pipe in basement crawl space to insure proper drainage – September 2009
Back steps and walkway to carport repainted – September 2009